THE ULTIMATE SOURCE FOR CREATIVE TALENT

Jamey Stillings' Colorado River Bridge Project

[ Posted: Jun 30, 2009 ]


      

Jamey Stillings' first encountered the construction site of the Colorado River Bridge downstream from Hoover Dam in March 2009. The bridge, part of the Hoover Dam Bypass Project, will eventually divert the majority of traffic off of the dam and across the Black Canyon separating Arizona and Nevada.

Once completed, the 1900 foot bridge will be the longest concrete arch span in the US and the fifth longest in the world. The NY Times Magazine recently featured Stillings' work in/on their 6/14/09 issue and website. To view the entire set of images click on link below. Design team: HDR Engineering, Jacobs, and T.Y. Lin International; Contractors: Obayashi Corp. and PSM Construction USA, Inc.

Related Links

- Sharpe + Associates, Inc.

- Jamey Stillings Photography, Inc.

- Colorado River Project